The Projects Report (Projects > Projects Report) turns your whole project history into one page of statistics: how much you’ve planned and captured, which rigs and filters carry the load, how many nights you actually imaged, how long projects take to finish, what your sub quality looks like, and which projects deserve attention. Everything comes from your local projects and the files Astro PM has already counted; nothing is uploaded. You can export the whole report, charts included, as a single HTML file.
Filters #
The bar across the top chooses which projects the report covers. All drop-downs start fully ticked.
| Control | Default | What it does |
|---|---|---|
| IMAGING SYSTEMS | All imaging systems | Tick rigs. Disabled systems are marked (disabled); (no imaging system) covers unassigned projects. Links: All · None · Enabled (Enabled ticks only your enabled rigs). |
| STATUS | All statuses | Planning, Active, Ready to Inspect, Ready to Process, Completed, Unfinished, On Hold. All · None. |
| TARGET TYPE | All types | The target types in your projects; (unset) for blank. All · None. |
| DATE RANGE | All time | All time, This week, Last 30 days, This month, Last month, Last 90 days, Year to date, Last 12 months, Previous year, or Custom… (shows From and To date pickers). |
| OPTIONS: Count disabled filter lines | Off | Cards leave switched-off filter lines out of planned and accepted totals. Tick this to count them here anyway. |
| Export HTML… | Saves this report, charts included, as a single HTML file you can open or share. | |
| ⟳ Refresh | Rebuilds the report. |
A project is in the date range if any of its imaging nights falls inside it. Projects without night data count if their lifetime (created to completed, or to their last imaging night) overlaps the range. The header repeats your filter choices in a sentence and shows when the report was generated.
Navigating the Report #
The REPORT SECTIONS list on the left jumps to and opens a section; Open all · Close all expand or collapse everything. At a glance is always shown, and a collapsed section still shows its summary cards. The app remembers which sections you left open. Each section header has a ? with a short About this section explanation.
At a Glance #
Totals across every project that matches the filters. Completion caps each exposure line at its planned count, the same rule the project cards use.
| Card | Shows |
|---|---|
| Projects | Project count, and distinct targets underneath. |
| Completed | Completed projects, and how many are still open. |
| Planned integration / Accepted integration | Hours, with sub counts. |
| Completion | Percent complete, capped per filter. |
| Acceptance rate | Accepted share of acquired subs, with the rejected count and time. |
| Inspected | Share of acquired subs opened in Sub Inspector. |
| Mosaics | Mosaic projects, with the total number of panels across those mosaics. |
| Exoplanet projects | Projects of type Exoplanet or with transit data; the line underneath splits them into N completed · M open. |
Report Sections #
| Section | What’s in it |
|---|---|
| Imaging Systems | One card per rig (accepted hours, projects, % done). Pies: projects by status, projects per imaging system. Bar: accepted integration per imaging system. Tables: completion per imaging system; observing sites with type, Bortle, projects and accepted time. |
| Imaging nights | A night counts when at least one sub of a selected project was captured that evening (dates come from the sub files via the normal count scans). Cards: imaging nights (first to last), moonless nights (Moon under 30% illuminated near midnight), moonlit nights, average per night, longest streak. Imaging nights per year per site; lines of nights and accepted hours per month; nights by calendar month (with more than a year of data) and by moon phase; pies per rig and per site; nights by weekday; most productive and most recent nights. |
| Project timeline | Median (and average) days to complete. Projects created and completed per month and per year; days from creation to completion; recently completed projects. Uses the completion date stamped when you save a project as Completed. |
| Targets and catalogs | Cards: top target type, most-used catalog, busiest declination band, peak month by projects and by planned hours. Bars: projects by target type, most-used catalogs, projects by season, by declination band, and peak season by best month to image. Top targets by accepted integration. Catalog counts come from each project’s catalog names (a project listing an NGC and a Sharpless number counts for both); best month is when the target transits near local midnight. |
| Integration by filter | Narrowband / broadband project counts and total accepted, plus a card per filter. Planned vs accepted per filter (stacked), share of accepted time by filter, a narrowband-vs-broadband Venn, a per-filter detail table (Planned, Accepted, Done, Subs acc., Rejected, Reject %, Avg sub, Inspected) and accepted subs by exposure length. Filter colours come from your filter library. |
| Sub quality | Averages of the quality values NINA writes into inspected sub filenames: HFR, guide RMS, eccentricity and SQM. HFR is shown in pixels and, where the rig’s pixel size and focal length are known, in arcseconds so rigs compare on one scale. FWHM is Sub Inspector’s measured fit, stored when a sub is analysed, never estimated. Cards per filter and a Best Bortle night; tables by filter (per rig when you have several), by imaging system and by project; FWHM, HFR and SQM distributions. Only subs loaded into Sub Inspector count. |
| Rejection analysis | Overall rejection and per-filter cards; rejection rate by filter, by imaging system and by exposure length (filters with fewer than five subs are left out); projects with the highest rejection rates (20+ subs acquired). |
| Watch lists | Oldest open projects; projects closest to done; biggest remaining backlog; Active projects with nothing accepted yet (when there are any); projects with the most accepted integration. |
| All projects in this report | Collapsed by default: the full list behind the numbers, with dates and rejection columns. |
Tip: Imaging-night data is recorded as project folders are scanned. If Imaging nights says No imaging-night data yet for these projects, open the projects or press Refresh on the project list once, then come back.
Exporting #
Export HTML… writes the report as it stands (filters, open sections and charts) into one self-contained HTML file. Open it in any browser, attach it to an email, or share it with your club; no Astro PM needed.