This page lists every control in Step 1. Simulator Strategy & Settings of the Nightly Simulator, in the order you see them, with its default, its range, and whether it changes the plan or only how NINA runs it. All of these settings are stored per imaging system, saved as you change them, and synced to the NINA plugin for that rig.
Before You Start #
- Pick the imaging system first (IMAGING SYSTEM at the top). Every value below belongs to that system.
- Changes save immediately and push to the cloud about 1.5 seconds later. Wait for Cloud updated next to Sync to Cloud.
- The plugin’s copy of these settings is read-only (Controlled by Astro PM) unless the rig is in Offline / Vacation Mode.
- The first time you open an imaging system, its settings start from the values you used before per-system settings existed.
Simulation Strategy #
| Setting | Default | What it does |
|---|---|---|
| Proportional Time Across All Targets | Selected | Splits the night between targets in proportion to their remaining work. On-screen description: “Divides time proportionally based on each target’s remaining work. Targets with more work get more time. LA filters prioritized during moon-down.” |
| Manual Priority Targeting | – | Images targets in your priority order, each one continuously while it is usable. “Images each target continuously while usable. Lunar avoidance filters prioritized when moon is down. Set each project’s Priority (1 = highest) to control the order.” Set the order by dragging projects on the Projects page. |
Both strategies are explained, with examples, in Scheduling Strategies.
Scheduling Options #
| Setting | Default | Range | What it does |
|---|---|---|---|
| Bonus Images | On | On / Off | When a target has finished its planned subs but time remains (or nothing else can image), keep capturing extra subs on it instead of sitting idle. Bonus subs rotate across the target’s filters, show green in the plan and as +N on the filter bar. If the current target has nothing it can use, bonus time can go to a neighbouring target instead. |
| Overshoot: | 0% | 0, 5, 10, 15, 20, 25% | Guaranteed extra subs per filter, as a percentage of its planned count: insurance for subs you’ll reject in SubInspector. 60 planned subs at 10% schedules 6 extra on that filter. Overshoot subs count as part of the project and run right after the planned subs, before any open-ended bonus. |
| Min-Time Tolerance: | 50% | 0, 10, 20, 25, 30, 40, 50, 60, 75% | How far below a project’s Min Time on Target a block may fall and still be scheduled. With a 60-minute minimum at 50%, a 30–59 minute block is kept; a 10-minute sliver is dropped and its time goes to a neighbour (planned work first, then bonus). 0% makes the minimum strict. The scheduler still aims for the full minimum whenever it can. |
| Treat Mosaic Panels Independently | On | On / Off | On: each mosaic panel is scheduled as its own target, with its own block and its own Min Time on Target. Off: the whole mosaic competes for time as one combined target. |
| Dither every N subs | On, every 3 | 1–5 | Nudges the mount a few pixels between exposures so hot pixels and pattern noise average out in the stack. The dither is planned into the log and NINA performs it at that point. |
| Individual filters override | Off | On / Off | Sits beside Dither. On: each filter line’s own Dither value is used (set per filter on the project’s exposure lines or in an exposure plan). A filter with a number dithers every that many subs, a filter set to Off never dithers, and a filter left on Default follows the global Dither setting on the left, including when that is unticked. Off: every filter follows the global setting. See Exposure Plans & Progress Tracking. |
| Filter switch every N subs | On, every 20 | Any whole number | Rotates through a target’s filters in batches of N instead of finishing one filter before starting the next, so channels stay balanced if the night is cut short. Off: each filter runs to completion before the next. |
| Filter switch tolerance | 50% | 0–100% in 10% steps | A runway guard. A switch may only start a filter that has time for at least this fraction of a batch (50% of 20 = 10 subs) before the block ends or that filter’s moon-safe window closes. If no filter qualifies, the current one keeps shooting. Higher means fewer switches near window edges. |
Tip: Min-Time Tolerance is the setting to reach for when a target keeps disappearing on bright-moon nights: it lets a shorter, moon-safe block through instead of dropping the target for the night.
NINA Execution #
Everything in the right-hand column is labelled “applied by the plugin at run time — does not change the simulation”. Changing these never moves a block in the plan; they tell NINA how to behave while running it.
| Setting | Default | Values | What it does |
|---|---|---|---|
| Execution Playback | Time-Aware Scheduling | Time-Aware Scheduling / Sequential Playback | How NINA follows the plan after delays. Time-Aware jumps ahead to the exposure that should be running now; Sequential runs every entry in order and never skips. See Playback Modes. |
| Enable Flats Sequence | Off | On / Off | At session end, NINA runs the Flat Handling instructions in the Astro PM Instructions container for exactly the filters, rotations and camera settings used that night. Off skips the flats section. Ticking it reveals the three options below. |
| Full Set of Flats | Off | On / Off | Take flats for every filter in the wheel at each target and rotation captured tonight, not just the filters shot. Useful for building a complete flat library in one pass. |
| Copy Flats to Each Target | On | On / Off | Targets sharing an identical rotation, filter and camera settings have their flats shot once. On: the files are copied into each of those targets’ folders. Off: one shared set under the first target, no duplicates. |
| Auto Flats Per Project | Off | On / Off | Take flats per project only when it needs them, instead of after every session. |
| Mode | Once Per Project | Once Per Project / Time Based | Once Per Project: flats only for combinations the project doesn’t have yet. Time Based: re-take a project’s flats every N days. |
| every N days | 7 | 1, 2, 3, 5, 7, 10, 14, 21, 30 | Time Based interval, counted in imaging nights from the project’s last flat session. |
A line under the flats options describes the current mode in plain words. The flats options are covered in depth in Automated Flat Handling and Flats Options: Full Set, Copy and Auto Flats.
Scheduling Priority #
The SCHEDULING PRIORITY strip holds four chips. Drag them to reorder; position 1 is the strongest. They decide which target goes first when several want the same time.
| Default position | Chip | Favours |
|---|---|---|
| 1 | Lowest Peak Altitude | Targets that never get high tonight, so they are imaged while they are at their best. |
| 2 | Setting Soonest | Targets whose usable window ends earliest. |
| 3 | Most Remaining Work | Projects with the most imaging time still to do. |
| 4 | Constrained Windows | Targets whose total usable time tonight is less than two minimum blocks. |
On-screen note: “Scheduling priority affects how targets are ordered when multiple compete for the same time window. With few targets or non-overlapping windows, the order may not change the schedule.” For moon-down time the scheduler applies its own order automatically (constrained targets first, then the most lunar-avoidance work, then setting soonest), so scarce dark hours go where they are most needed. Under Manual Priority Targeting the chips aren’t used: your project order decides.
Settings That Live on the Project #
A few inputs to the scheduler are set per project rather than per rig. They are edited in the project, not in Step 1:
| Project setting | Default | Effect on the schedule |
|---|---|---|
| Status | Planning | Only Active projects are scheduled. |
| Min Altitude (°) | 30 | Time below this altitude is unusable for the target. |
| Min Time on Target (hrs) | 1.0 | The block length the scheduler aims for (see Min-Time Tolerance above). |
| Twilight Type | Astronomical (-18°) | When the night starts and ends for this project. Nautical (-12°) and Civil (-6°) give more, brighter time. |
| Moon avoidance per filter | – | Which filters may run with the Moon up, and at what separation. See Moon Avoidance Profiles. |
| Priority | Unset | Order under Manual Priority Targeting (drag order on the Projects page). |
| Exposure plan | – | Filters, counts, exposure, gain, offset, binning and readout mode. The per-filter ON/OFF switch on the Step 2 card disables a filter in both the simulator and NINA. |
See Creating Projects & Targets for where each of these is edited.
What the Plugin Uses #
The NINA plugin uses the whole Step 1 block for its rig: strategy, Execution Playback, Bonus Images, Overshoot, Min-Time Tolerance, mosaic handling, dither and filter-switch settings, all flats options and the SCHEDULING PRIORITY order. It reads them from the cloud at every simulation and every schedule build. If it cannot get them, NINA shows why (for example “Imaging system ‘X’ has no scheduling settings from the desktop yet — save simulator settings in the Astro PM app and Sync to Cloud.”) and uses the last settings it has. See Connecting NINA to Astro PM.